Maker Faire Sign (large project): Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
Ian Oliver (talk | contribs) m (Ian Oliver moved page Maker Faire Sign to Maker Faire Sign (large project): moving in preparation to use the existing title for info on the sign itself) |
||
(8 intermediate revisions by 2 users not shown) | |||
Line 7: | Line 7: | ||
Member contact: Email, found via list. | Member contact: Email, found via list. | ||
Project name & pitch: Makerfaire Sign. 14' x 2.5' metal sign for Makerfaire. Used every year at Makerfaire, stored up on chain over the metal shop the rest of the year. | Project name & pitch: Makerfaire Sign. 14' x 2.5' metal sign for [[Makerfaire 2013]]. Used every year at Makerfaire, stored up on chain over the metal shop the rest of the year. | ||
Storage location: Vertically stored during construction, next to bay whiteboard. | Storage location: Vertically stored during construction, next to bay whiteboard. | ||
Line 21: | Line 21: | ||
* 31 Aug, 2013 - Project documentation started. Sheet metal is mounted to wood. Eyebolts and carabiners purchased. Waiting on chain & design. | * 31 Aug, 2013 - Project documentation started. Sheet metal is mounted to wood. Eyebolts and carabiners purchased. Waiting on chain & design. | ||
* 07 Sept, 2013 - Paint stripped. | |||
* 11 Sept, 2013 - Chain picked up. Ready for cutting and mounting. | |||
* 20 Sept, 2013 - Plasma cut sign, added red backing, drilled & mounted eye bolts, took to Makerfaire, mounted chain on ceiling, waiting on ladder/help to lift. | |||
* 27 Sept, 2013 - Deadline failed. Plan for hauling it up, just needs more people to help. | |||
* 09 Sept, 2013 - Tried again to mount, shut down due to safety issues again. Devised safer lifting plan. | |||
* 24 Oct, 2013 - Two more shutdowns due to safety issues, but, sign is up. | |||
PROJECT COMPLETED (until next year). | |||
[[Category: | [[File:Makerfaire_Sign_Build_02.jpg|350px|thumb|right|]] | ||
[[Category:Past projects]] | |||
[[Category:Ongoing projects]] |
Latest revision as of 05:43, 2 June 2016
Info
Member name: Matt F
Member contact: Email, found via list.
Project name & pitch: Makerfaire Sign. 14' x 2.5' metal sign for Makerfaire 2013. Used every year at Makerfaire, stored up on chain over the metal shop the rest of the year.
Storage location: Vertically stored during construction, next to bay whiteboard.
Project start date: 31 Aug, 2013
Final Deadline: 26 Sept, 2013
Updates
- 31 Aug, 2013 - Project documentation started. Sheet metal is mounted to wood. Eyebolts and carabiners purchased. Waiting on chain & design.
- 07 Sept, 2013 - Paint stripped.
- 11 Sept, 2013 - Chain picked up. Ready for cutting and mounting.
- 20 Sept, 2013 - Plasma cut sign, added red backing, drilled & mounted eye bolts, took to Makerfaire, mounted chain on ceiling, waiting on ladder/help to lift.
- 27 Sept, 2013 - Deadline failed. Plan for hauling it up, just needs more people to help.
- 09 Sept, 2013 - Tried again to mount, shut down due to safety issues again. Devised safer lifting plan.
- 24 Oct, 2013 - Two more shutdowns due to safety issues, but, sign is up.
PROJECT COMPLETED (until next year).