Break-Fix log: | Break-Fix log: | ||
* | *2016-11-06: Chiller failure. Laser tube destroyed (overheated and glass cracked) | ||
* | **2016-11-07: Laser tube replaced with an aging, but unused tube that was donated from a scrap laser | ||
*2016- | *2016-11-11: Chiller failure. Laser tube destroyed. | ||
*2016- | **2016-11-13: Two new laser tubes ordered from an American source. | ||
**2016-11-24: Laser tube replaced, chiller pump is broken. | |||
*2016-11-13 | **2016-12-04: Chiller repaired. Alignment and power testing is pending. | ||
*2016-11- | **2016-12-18: Laser is fully operational. | ||
*2016- | *2019-08-17: Lens failure. [https://groups.google.com/forum/?hl=en#!topic/protospace-discuss/6d1VIPmlR_4] | ||
* | **2019-08-17: New lens ordered. | ||
Regular maintenance log: | Regular maintenance log: |