430
edits
(Seeded Page) |
m (→Updates) |
||
Line 18: | Line 18: | ||
*''' 02 Sept, 2013 -''' Vacuum is strapped to frame, box prototype is done. Vacuum is too loud. Considering running directly off of HVAC instead for low pressure air source. | *''' 02 Sept, 2013 -''' Vacuum is strapped to frame, box prototype is done. Vacuum is too loud. Considering running directly off of HVAC instead for low pressure air source. | ||
*''' 12 Sept, 2013 -''' No progress. Laser's still down. | |||
[[Category:OngoingProjects]] | [[Category:OngoingProjects]] |