Maker Faire Sign (large project): Difference between revisions

mNo edit summary
Line 23: Line 23:
* 07 Sept, 2013 - Paint stripped.
* 07 Sept, 2013 - Paint stripped.
* 11 Sept, 2013 - Chain picked up. Ready for cutting and mounting.
* 11 Sept, 2013 - Chain picked up. Ready for cutting and mounting.
* 20 Sept, 2013 - Plasma cut sign, added red backing, drilled & mounted eye bolts, took to Makerfaire, mounted chain on ceiling, waiting on ladder/help to lift.


[[Category:OngoingProjects]]
[[Category:OngoingProjects]]