37
edits
No edit summary |
No edit summary |
||
Line 9: | Line 9: | ||
* 3D printing workshop (Kaz) - 60 minutes - 3pm | * 3D printing workshop (Kaz) - 60 minutes - 3pm | ||
=== Cleaning === | |||
*Tuesday 30th October & Thursday 1st November | |||
*Check list | |||
**Bathrooms Cleaned | |||
**upstairs vacuumed | |||
**shop floor swept/mopped | |||
**work tables washed/folding tables cleaned also | |||
**shelves dusted (we didn't do this as we moved still need to clean them off) | |||
=== Blog Post/Media Posts === | |||
*graphics (see Dave E) | |||
*map showing street parking | |||
*map showing our location | |||
*list of presentations and work shops with times so far | |||
=== Misc === | |||
---- | |||
*Verify an assortment of laptop connections are possible/available for projector for presentations | |||
*Determine if we need microphone or not in presentations if so than find/hookup | |||
*Possibly setup a recording system for presentations if presenters allow it (will need mic for this) | |||
*Print schedules of workshops/talks for on walls by doors | |||
*Temporary Road signage | |||
*Talk to neighbours warn them about traffic flow on Saturday/invite them? | |||
*Figure out seating for upstairs/move coffee tables out temporarily and seating for work shops so we dont have people carrying chairs or are some work shops happening upstairs also? | |||
=== Supplies Needed === | |||
---- | |||
{| border="1" cellpadding="2" | |||
|- | |||
| | '''Needed''' | |||
| | '''Supplied by''' | |||
| | '''Notes''' | |||
|- | |||
| Pop|| || verify we are stocked or get more | |||
|- | |||
| Water|| || verify we are stocked or get more | |||
|- | |||
| Food tray || || meat/cheese | |||
|- | |||
| Food tray || || veggie/dip | |||
|- | |||
| other snacks|| || chips | |||
|- | |||
| other snacks|| || ?? | |||
|- | |||
| small paper plates|| || Probably good already but verify | |||
|} |
edits