|
|
Line 81: |
Line 81: |
| ==Repairs Needed== | | ==Repairs Needed== |
|
| |
|
| *Upgrades discussed
| | Shocks replaced on lid |
| **Adding air cooling to optics and laser head block
| |
| **Convincing power supply to modulate power levels properly
| |
| **Seal display on controller to prevent smoke from clouding over time.
| |
| **Replace and upgrade chiller (current chiller struggles to keep up with heat generated, and has no safeties on it to signal failure)
| |
| **Relocate chiller to an open-air position (wall mounted)
| |
|
| |
|
| ==Repair History== | | ==Repair History== |