74
edits
Merovingian (talk | contribs) No edit summary |
(→To Do) |
||
Line 70: | Line 70: | ||
==To Do== | ==To Do== | ||
* Draft proposal to CPAA; achieve buy-in from group (Mike, Ben) | |||
* Clean fish tank (not the filters inside the pump housing, we need those as-is) | |||
* Clean growth trays | |||
* Contact CDC project members; inquire about tour of Brooks facility if it is still operational | |||
* Contact Zoo for tour of Conservatory including in-depth workings of the greenhouse's operating system(s) (behind the scenes) | |||
* Contact Sam Livingston Fish Hatchery (Inglewood) for in-depth tour of operations | |||
* Research facility in Edmonton; apparently there is a substantial project in operation up there as well | |||
* Acquire 200-300 gallon per hour pump (see note1) | |||
* Lighting (see note1) | |||
*Notes | |||
1. Conditional on go-ahead from CPAA |
edits