15
edits
m (Updated image link) |
|||
Line 95: | Line 95: | ||
**Convincing power supply to modulate power levels properly | **Convincing power supply to modulate power levels properly | ||
**Seal display on controller to prevent smoke from clouding over time. | **Seal display on controller to prevent smoke from clouding over time. | ||
**Replace and upgrade chiller (current chiller struggles to keep up with heat generated, and has no safeties on it to signal failure) | |||
**Relocate chiller to an open-air position (wall mounted) |
edits