Woodshop Rebuild (2013): Difference between revisions
Jump to navigation
Jump to search
(Created page with "{{subst:Template:ProjectStorage}}") |
Ian Oliver (talk | contribs) (archived page) |
||
(9 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{archived page|lastupdate=in October 2013|newpagelink=nowhere}} | |||
==Info== | ==Info== | ||
'''Member name:''' | '''Member name:''' Matt F | ||
'''Member contact:''' | '''Member contact:''' Email, found via list. | ||
'''Project name & pitch:''' | '''Project name & pitch:''' Woodshop Rebuild. For Protospace. Encompasses: radial arm saw, pegboard & steel shelving on the Transition Projects list. Also, table saw, new workbench, table shuffling, and others. Details expanded below. | ||
'''Storage location:''' | '''Storage location:''' Woodshop & scattered during construction | ||
'''Project start date:''' | '''Project start date:''' 31 Aug, 2013 | ||
''' | '''Final Deadline:''' 01 Dec, 2013 | ||
==Updates== | |||
*''' 02 Sept, 2013 -''' Overhead shelf is half done. Waiting on workbench to size remaining build. | |||
*''' 04 Sept, 2013 -''' Travis, Jim, Hayley, & Matt migrate 400 lb workbench into Protospace. | |||
*''' 08 Sept, 2013 -''' Travis, Dave B, Kevin, Hayley, Robb & Matt assist in welding up 2nd rack and relocating some tools, shuffling 8 foot workbenches. | |||
*''' 11 Sept, 2013 -''' Hayley finishes cutting and sanding letters for Woodworking sign, Robb donates stain. | |||
*''' 20 Sept, 2013 - ''' No progress. | |||
*''' 27 Sept, 2013 - ''' Some shuffling, some planning, mezzanine sourced, no build progress. | |||
*''' 09 Oct, 2013 - ''' Project stalled until mezzanine in place. | |||
== | ==Additional Details== | ||
*' | *Table saw is getting a table built for it, so it can double as a workbench. | ||
*Travis is bringing in his personal woodworking bench with all kinds of fancy features. He's waiting on a trailer, help, and time. | |||
*2nd metal overhead shelf is getting welded, will be where tools are stored and each will have its designated place. | |||
*Remaining pegboard will cover back wall (I gave away most of it to members since we didn't need much). | |||
*Radial arm saw table will be fitted somewhere. | |||
[[Category: | [[Category:Past projects]] |
Latest revision as of 06:24, 2 June 2016
This page is archived as its information is no longer current. Last update: in October 2013. Current information on this subject can be found at nowhere. |
Info
Member name: Matt F
Member contact: Email, found via list.
Project name & pitch: Woodshop Rebuild. For Protospace. Encompasses: radial arm saw, pegboard & steel shelving on the Transition Projects list. Also, table saw, new workbench, table shuffling, and others. Details expanded below.
Storage location: Woodshop & scattered during construction
Project start date: 31 Aug, 2013
Final Deadline: 01 Dec, 2013
Updates
- 02 Sept, 2013 - Overhead shelf is half done. Waiting on workbench to size remaining build.
- 04 Sept, 2013 - Travis, Jim, Hayley, & Matt migrate 400 lb workbench into Protospace.
- 08 Sept, 2013 - Travis, Dave B, Kevin, Hayley, Robb & Matt assist in welding up 2nd rack and relocating some tools, shuffling 8 foot workbenches.
- 11 Sept, 2013 - Hayley finishes cutting and sanding letters for Woodworking sign, Robb donates stain.
- 20 Sept, 2013 - No progress.
- 27 Sept, 2013 - Some shuffling, some planning, mezzanine sourced, no build progress.
- 09 Oct, 2013 - Project stalled until mezzanine in place.
Additional Details
- Table saw is getting a table built for it, so it can double as a workbench.
- Travis is bringing in his personal woodworking bench with all kinds of fancy features. He's waiting on a trailer, help, and time.
- 2nd metal overhead shelf is getting welded, will be where tools are stored and each will have its designated place.
- Remaining pegboard will cover back wall (I gave away most of it to members since we didn't need much).
- Radial arm saw table will be fitted somewhere.